JASO Industrial Cranes with FCC in Saudi Arabia
FCC's precast factory in Saudi Arabia for Riyadh's new metro has been equiped with JASO Industrial Cranes.
Need
The FCC-led consortium, FAST, is responsible for the construction of lines 4, 5 and 6 of the Riyadh’s metro in Saudi Arabia, which includes 24 stations (elevated, ground level and underground) with 64 km of track. To implement successfully such a massive project, FCC has required the installation of bridge cranes in its Precast Beams Factory, all of them adapted for the work in complex environments (dust and high temperatures).
Solution
JASO Industrial Cranes has been chosen to deal such an ambitious turnkey project, and it’s been in charge of supplying 8 cranes: 2 Gantry Cranes of 50+50T, Span of 18,400 m, 2 Gantry Cranes of 20+20T Span of 18,400 m, 2 Double-Girder cranes of 16+16T, Span of 20,650 m. and 2 Double-Girder cranes of 10+10T, Span of 20,650 m. The providing objective it’s been the integral solution for each manufacturing phase. With this project JASO Industrial Cranes gets a market position in lifting solutions for manufacture plants all around the world.